Commissioning and hardening notes and organizational measures

The following commissioning instructions must be followed:

General instructions:

  • As far as possible, avoid connecting the Motor Driven Roller (and the upstream electronics required for operation) to open networks or the internet. We recommend organizational and technical actions for the Motor Driven Roller and the required upstream electronics.

  • For protection, additionally use data link layers such as a VPN for remote access.

  • Install Firewall mechanisms, IPS (Intrusion Prevention Systems) and IDS (Intrustion Detection Systems).

  • Connect external devices upstream to provide protection against DoS (Denial of Service) or DDoS (Distributed Denial of Service).

  • Restrict physical access to authorized persons only.

Commissioning and hardening instructions:

  • Check the security maintenance instructions in the documentation of the upstream electronics to plan the commissioning and hardening procedure.

  • This component, considered on its own, does not require special commissioning and hardening procedures.

Periodic Security Maintenance:

  • Check the security maintenance instructions in the documentation of the upstream electronics to plan the periodic security maintenance.

  • This component, considered on its own, does not require periodic security maintenance.

Decommissioning Instructions:

  • Check the security maintenance instructions in the documentation of the upstream electronics to plan the decommissioning.

  • This component, considered on its own, does not require any decommissioning procedures.

Removal of product from environment:

  • Check the security maintenance instructions in the documentation of the upstream electronics to plan the decommissioning.

  • This component, considered on its own, does not require any removal procedures from the environment.