Commissioning and hardening notes and organizational measures

The following commissioning instructions must be followed:

General instructions

  • As far as possible, avoid connecting the AC and Servo Motors to open networks or the internet.

  • Connect external devices upstream to provide protection against DoS (Denial of Service), DDoS (Distributed Denial of Service) attacks, Firewall mechanisms, IPS (Intrusion Prevention Systems) and IDS (Intrusion Detection Systems).

  • Restrict physical access to authorized persons only.

Commissioning and hardening instructions

  • The ETS (Electronic Name Plate) contains motor-specific parameters. These can be used (with a suitable motor-inverter combination) to preset the motor parameters during commissioning. These parameters must be validated during commissioning by means of a test run.

  • If motor feedback is used, the correct function must be validated during commissioning. This applies to the direction of rotation as well as the necessary parametrization. This must be tested with a test run.

  • The interface of the ETS (Electronic Name Plate) as well as the motor feedback has no protection against DoS attacks. This must be switched upstream by application (e.g. by using a suitable inverter).

Periodic security maintenance

  • n.a.

Decommissioning instructions

  • n.a.

Removal product from environment

  • n.a.