FAST Motion and FAST Technology modules
Case 1: Standard technology modules
-
Configuration: FAST Toolbox = 100 AC
-
Total "Application Credit" of all users: 300 AC
-
Credit on the SD card: 300 AC
-
Calling up the FAST technology module CrossCutter (requirement: 100 AC)
Result:
-
The FB is commissioned correctly and the axis works as programmed.
-
No messages were entered in the logbook.
Case 2: Standard technology modules plus one FAST technology module without configured "Application Credit"
-
Configuration: As case 1
-
In addition, the FB TablePositioning is called up for another axis (requirement: 25 AC).
-
The FB is commissioned correctly and axis 1 works as programmed.
Result:
-
An error message appears in the logbook stating that the "Application Credit" configured for the FAST Toolbox has been exceeded.
-
After switching the machine off and on again, an error message appears in the logbook stating that the start of the application is delayed because there is a license violation.
-
The application starts after the delay time has elapsed.
-
If the FB is not called again during the rest of the runtime of the switch-on process (there is no license violation), the application also boots without delay the next time it is switched on.
-
Each time the device is switched on, the boot-up time is extended until the maximum delay time of 20 minutes is reached.
Case 3: Permanent call of the FAST PLCopen without sufficient "Application Credit" on the SD card
-
Configuration: As case 1
-
The FB MoveAbsolute is also called up for axis 1.
-
The FB is commissioned correctly and axis 1 works as programmed.
Result:
-
An error message appears in the logbook stating that the "Application Credit" configured for the FAST Toolbox has been exceeded.
-
After switching the machine off and on again, an error message appears in the logbook stating that the start of the application is delayed because there is a license violation.
-
The application starts after the delay time has elapsed.
-
Each time the device is switched on, the boot-up time is extended until the maximum delay time of 20 minutes is reached.