Commissioning notes on "Internal Control"
Operation of the FBs via the visualisation is referred to as "Internal Control". For operation of the FBs via the visualisation, the latter has to be enabled first.
The "Internal Control" is enabled in three steps:
- Insert and reference the visualisation of a TM into the application.
- Enable the option for activating the "Internal Control":
Go to the PLC program and set the
xEnableInternalControl
input of the FB
L_MC4P_AxesGroupBasicControl
to TRUE.
(Only this setting makes the "Internal Control" switch is visible in the visualisation.)
(Only this setting makes the "Internal Control" switch is visible in the visualisation.)
- Operate the "Internal Control" button in the visualisation to activate the control via the visualisation.
When "Internal Control" is activated, the inputs of the FB interconnected in the PLC program are disconnected and the input values are transmitted from the visualisation instead.
|
Note!
When "Internal Control" is activated, the following input values are accepted both from the visualisation and from the application:
|