Start/stop/abort tracking

Start tracking

The FB is started by a rising edge at the Execute input. The FB itself does not instruct any motion but is only responsible for the calculation of the dynamic product coordinate system (PCS).

  • Synchronisation is only effected if a motion-activating FB (e.g. MC_MoveLinearAbsolute , MC_MoveLinearRelative ) is called in the same PCS as the MC_TrackConveyorBelt .
  • Clutch-in modes and prioritisations
    • The ClutchTime input parameterises a time-controlled clutching and is used when the ClutchDistance input is assigned with zero.
    • The ClutchDistance input parameterises a path-controlled clutching and has priority over the ClutchTime input.
    • If both inputs are parameterised, an error is output.
    • If both inputs are parameterised to non-zero, ClutchDistance is used
  • Behaviour in case of abortion
    • The declutch process always uses the time entered at the ClutchTimeAbort output if the active tracking was aborted before via the Abort input.
  • If the kinematics moves synchronously to the belt conveyor, the InSync output is set to TRUE.
  • The starting performance depends on the configuration of the SetDynPCS input:
    • SetDynPCS = TRUE (default): With a rising edge at the Execute input, the calculation of the dynamic PCS starts immediately.
    • SetDynPCS = FALSE: With a rising edge at the Execute input, the calculation is only prepared (the current belt position is saved). Only when the SetDynPCS input is set to TRUE, the calculation of the dynamic PCS starts.
      Delayed setting of the PCS
  • The DynPCSSet output shows that a dynamic PCS is calculated and the FB is ready to synchronise an instructed motion.
  • The Active output is set if the FB transmits overlapping values to the axes group, which means that a synchronisation is active.
Stop tracking

Tracking is stopped if a motion-instructing FB is executed together with a different PCS than the dynamic one used. If afterwards a motion is instructed again in the dynamic PCS, it is synchronised again.

When the synchronised motion is decoupled, the following applies (according to clutch-in): The target point programmed in the motion-instructing FB is only reached if both the MC_TrackConveyorBelt and the overriding FB set their Done outputs.

Note!

If the Execute input is set during or before a synchronisation to FALSE, the synchronisation is executed anyway.

Abort tracking

The following options are available to abort the tracking:

  1. Activating the Abort input
    A time-controlled declutch process with the time defined at the ClutchTimeAbort input is executed.
  1. Writing access to the selected PCS by another FB (e.g. MC_SetCoordinateTransform )
    An executed abortion is indicated via the CommandAborted () output.
Note!

The active tracking can only be aborted if

  • no motion is active in the tracked PCS at the time of the abort and
  • no motion waits for being executed.

If the PCS is still tried to be accessed,

  • the calling FB outputs an error.
  • the active tracking will not be aborted.