Commissioning

The steps required to control the device as an EtherNet/IP adapter with a Rockwell EtherNet/IP scanner are described below.
 
Preconditions
–
The inverter is networked as EtherNet/IP Adapter with an EtherNet/IP Scanner and, if necessary, further EtherNet/IP nodes.
 
–
Typically, an EtherNet/IP network consists of segments that contain point-to-point connections in a star configuration.
 
–
See also "Typical topologies" under: EtherNet/IP 
 
 
–
An Engineering PC with the programming software »RSLogix™ 5000« (from version 20) is connected to the Scanner.
 
–
Current device description files for EtherNet/IP are available.
 
–
Download of current EDS files
The EDS file of the i950 supports AOP (Add On Profile). The tags used are matched to the Lenze applications. This gives the user a better understanding when configuring with »RSLogix™ 5000«.
As of inverter firmware V1.6.x, the EDS file with the name Lenze_i951_ACD_V2.eds must be used.
 
 
–
The »EDS Hardware Installation Tool« of the »RSLogix™ 5000« installs the EDS files.
 
 
–
An »RSLogix™ 5000« project has been created and is in the offline state.
 
–
The CPU and Ethernet adapter of the PLC ((Scanner)) have been configured.
 
–
All EtherNet/IP nodes are supplied with voltage and are switched on.