Required commissioning steps
How to configure the network with "RSLogix™ 5000" (from version 20):
✓
The PC with the programming software »RSLogix™ 5000« must be in the same network as the devices to be configured.
Configure IP communication.
1.
Make basic IP settings on the engineering PC.
2.
Via the Rockwell tool »BootP-DHCP Tool«, set a DHCP server or the »EASY Starter«:
a.
IP address of the inverter (adapter) 0x23A1:001
b.
Subnet mask 0x23A1:002
c.
Gateway address 0x23A1:003
3.
Save parameter settings: 0x2022:003 = "On / start [1]"
4.
Restart the EtherNet/IP communication: 0x23A0 = "Restart with current values [1]"
The configuration of the IP communication is now completed.
Configure technology application:
1.
Select technology application: 0x4000 > 1.
2.
Select TA interface: 0x4001 = 0 "Fieldbus network"
3.
Save parameter settings: 0x2022:003 = "On / start [1]"
The technology application is now controlled via the scanner.
Define I/O configuration:
1.
»RSLogix™ 5000« Start.
2.
Open or recreate a »RSLogix™« project.
3.
Configure the cyclic data transfer (Implicit Messaging).
Network configuration of the inverter with EDS file
Network configuration of the inverter without EDS file
If CIP Safety is used, safety process data can be added:
Network configuration of the inverter with EDS file
Network configuration of the inverter without EDS file If CIP Safety is used, safety process data can be added:
4.
Configure the acyclic data transfer (Explicit Messaging).
Parameter data transfer
Parameter data transfer The configuration of the network is now completed.
Complete the commissioning:
1.
Save the "RSLogix™" project and load the configuration into the PLC (scanner).
Save »RSLogix™« project/Load configuration into the Scanner
Save »RSLogix™« project/Load configuration into the Scanner 2.
Restart communication, when the EtherNet/IP configuration has been changed.
Restarting or stopping the communication
Restarting or stopping the communication Commissioning is completed.