Commissioning
In the following, the steps required for controlling the inverter via POWERLINK are described.
Parameterisation required
1.
Activate network control: 0x2631:037 (P400.37) = "TRUE [1]"
2.
Set network as standard setpoint source: 0x2860:001 (P201.01) = "Network [5]"
3.
Set the node address.
–
Each network node must be provided with a unique node address (node ID).
–
Details:
Basic setting and options
Basic setting and options 4.
Save parameter settings: 0x2022:003 (P700.03) = "On / start [1]".
5.
Switch the inverter off and then on again in order that the changed communication settings can get effective.
6.
Check the readiness for operation
of the inverter by means of the LED status displays.
–
The red LEDs must be off, otherwise an error has occurred.
–
The green LED at the RJ45 socket is on if a physical POWERLINK connection is available.
–
Details:
Status LEDs
Status LEDs In the default setting, the digital input DI1 is assigned the "Run" function. If the network control is activated, this function serves as "start enable" for start commands via network. Hence, the digital input DI1 must be set to the HIGH level in order that the motor can be started via the network.
Start network
The network is automatically started if you first set all controlled nodes (as described above) and then the managing node.
Otherwise, there are the following two options:
a.
Switch all network nodes off and then on again or
b.
make a fault reset at the managing node (node ID 240).