Commissioning

In the following, the steps required for controlling the inverter via PROFIBUS are described.
 
Parameterization required
1.
Activate network control: 0x2631:037 (P400.37) = "TRUE [1]"
 
2.
Set network as standard setpoint source: 0x2860:001 (P201.01) ="Network [5]"
 
3.
Set PROFIBUS station address.
 
–
Each network node must be provided with a unique station address.
 
–
 
 
4.
Optional: Change the response of the inverter if the communication to the PROFIBUS master is interrupted.
 
–
Default setting: If communication is interrupted, an error is triggered.
 
–
See: Monitoring 
 
 
5.
Save parameter settings: 0x2022:003 (P700.03) = "On / start [1]".
 
6.
Switch the inverter off and then on again in order that the changed communication settings can get effective.
 
7.
Configure the host system (master) in order to enable communication with the inverter.
See: Configuring the host system (master)
 
8.
Control inverter via RPDO (and evaluate in the current status via TPDO).
 
–
For assignment of the control word and setpoint selection, see Define your own control word format .
 
–
For assignment of the status word and actual value output, see Define your own status word format .
 
–
Acceleration 0x2917 (P220.00) and deceleration 0x2918 (P221.00) can be set/changed via the acyclic parameter data transfer.
 
 
In the default setting, the digital input DI1 is assigned the "Run" function. If the network control is activated, this function serves as "start enable" for start commands via network. Hence, the digital input DI1 must be set to the HIGH level in order that the motor can be started via the network.
 
 
Configuring the host system (master)
Configure the host system (master)
with a configuration software as follows in order to enable communication with the inverter.
1.
Import the device description file of the inverter
into the master.
Download of the GSD file
The following language versions of the device description file can be used:
 
–
LENZE[product type].GSD (source file, English), e.g. LENZE550.GSD for i550
 
–
LENZE[product type].GSG (German), e. g. LENZE550.GSG for i550
 
–
LENZE[product type].GSE (English), e. g. LENZE550.GSE for i550
 
 
2.
Define the user data length.
 
–
The user data length is defined during the initialization phase of the master.
 
–
The inverter supports the configuration of max. 16 process data words (max. 32 bytes).
 
–
The user data length for process input data and process output data is the same.
 
 
3.
Adapt data mapping in the configuration software.
See: Standard mapping 
 
4.
Save configuration.
 
 
Start-up of the host system (master)
–
After the start-up, the master communicates the structure of the cyclic frames to the inverter (slave) via the configuration frame (CHK_CFG).
 
–
The inverter checks the configuration. If the configuration is accepted, the inverter changes from the "Wait Configuration" state to the "Data Exchange" state. It is now possible to exchange user data with the master.
 
–
The internal mapping of the process data is set in 0x24E0:001 ... 0x24E0:016 (direction Master → Inverter) and 0x24E1:001 ... 0x24E1:016 (direction Inverter → Master). Format:
0xiiiissll (iiii= Index hexadecimal, ss= subindex hexadecimal, ll= data length hexadecimal)