Commissioning
Online commissioning
Usually, the IO-Link device is configured and parameterized by means of engineering tools. After the user has assigned values to the parameters, these are loaded into the IO-Link device and become active. These parameters are uploaded to the Data Storage within the IO-Link master by means of a system command.
Off-site commissioning
Another option is to configure and parameterize the IO-Link devices by means of additional tools, such as the "USB master," outside of the machine or plant. The USB master tool loads the parameter set to the IO-Link device according to configuration, parameter setting and validation (to become "active"). After the installation in the machine or plant has been completed, these parameters are automatically uploaded to the Data Storage of the IO-Link master.
Preconditions
–
The inverter is connected as an IO-Link device to an IO-Link master.
–
The entire wiring has been checked for completeness, short circuit and earth fault.
–
All IO-Link nodes are supplied with voltage and are switched on.
–
The functional test described in the mounting and switch-on instructions has been completed successfully (without any errors or faults).
–
The IO-Link master is configured for Data Storage.