The following commissioning instructions must be followed:

General instructions

  • An IT security-protected network environment is mandatory for operating the Controller. Operation on the Internet is not permitted.

  • For protection, additionally use data link layers such as a VPN for remote access.

  • Install Firewall mechanisms, IPS (Intrusion Prevention Systems) and IDS (Intrustion Detection Systems).

  • Connect external devices upstream to provide protection against DoS (Denial of Service) or DDoS (Distributed Denial of Service) attacks.

  • Restrict physical access to authorized persons only. A particular focus here is on physical access to the SD Card. This concerns access to the data on the SD Card, but also the physical swapping of SD Cards between Controllers.

  • Change existing default passwords after the first start-up and regularly afterwards. Please use only high-strength passwords.

  • As soon as the web server functions of the Controller are accessed with a browser, we recommend activating the logging functions of the browser and backing up the certificate store of the browser. In this way, communication to the Controller can be traced.

  • The Controller records activities via an internal security logbook. This also applies to the tool accesses such as PLC Designer, EASY Starter Suite, UI Designer, etc.. This must be taken into account by the customer when considering data protection.

 

Input Validation for Customer Data

If you copy your own data to the Controller or to the SD Card, validation of this data is crucial to ensure that it is correct, complete and functional. Validation can take place on several levels.

Format and structure check: Ensure that the data corresponds to the expected format. For example, if you have copied zip files or docx files to the Controller, check after the process whether these files still have the original file format.

Integrity check: Another type of validation is the integrity check. This involves checking that the data has not been corrupted. This can be done by executing the data on the Controller or by using hash values or checksums.

Correct execution: Last but not least, you can check the execution of the copy process itself. This is done by reading the log entries. If a copy process was initiated, an entry was created for this in the audit log. This entry proves that the copy process was carried out.

Commissioning and hardening instructions

Device Security:

  • On receipt of the Controller, the security seal must be checked to ensure that it is intact (Controller.SecuritySeal).

Operation System Security:

Prepare Programming and Design Application:

Initial Programming and Application Security:

Error Handling, Reset, Backup and Restore:

Optional OPC UA Functionalitites:

EASY Starter Suite:

UI Designer and Web Visualization:

  • Restart Device:
    After all settings have been configured, the device must be restarted for the changes to take effect.

Periodic security maintenance

  • It is recommended to check the password policy periodically for updates and to adjust the requirements if necessary.

  • It is recommended to change the passwords cyclically.

  • It is recommended to check the certificates used with regard to their key lengths for up-to-dateness and to generate new certificates with higher key lengths if necessary.

  • It is recommended to exchange the certificates regularly.

Decommissioning instructions

  • The device command 0x2022:001 "Device command: Load Lenze settings" must be executed. This resets all application settings.

  • The Reset to Factory Default should also be carried out (Controller.ResetToFactoryDefault).

  • It is recommended to update the firmware using the EASY Firmware Loader.

  • Remove the SD card and format it (in order to retain the Application Credits, the corresponding data must first be memorized and restored on the formatted SD card).

Removal product from environment

  • It is recommended that all industrial communication partners of the controller to be removed, to change the trusted certificates of the controller into untrusted certificates.

  • It is recommended to securely remove the login data for the controller to be removed, and such as name and password for the necessary authentication, from all industrial communication partners.